Construction Management

Three construction workers

Key Features

  • Fire Hydrant Replacements – Replacement of numerous fire hydrants around the District
  • Rock Creek Sewer Regulator Adjustments - Separation of 12", 15", and 18" sewers, watermain replacement and structure modfications
  • Rock Creek Siphon - Cleaning and rehabilitation of the siphons
  • Potomac Interceptor Odor Control MD & DC - Construction of four odor control facilities, yard piping and site work
  • Potomac Interceptor VA - Construction of two odor control facilities, yard piping and site work
  • MacMillan Stormwater Storage – Construction management for design build project developing stormwater storage for the Bloomingdale neighborhood
  • Support of DETS with inspection services

Services Rendered

  • Program/Project Management
  • Construction Management
  • Professional Engineering
  • Resident Engineering and Inspection
  • Agency/Utility Coordination
  • Construction Administration
  • As-Built Services

District of Columbia Water and Sewer Authority

Water/Wastewater | Construction Management | Survey Services | Site/Civil Engineering | Transportation/Traffic | Structural
/Portals/0/UltraPhotoGallery/683/37/thumbs/3.Picture 196.jpg
Picture 196
1/21/2016 11:51:00 AM
Picture 171
1/21/2016 11:51:00 AM
GEORGETOWN SEWER REHAB MH#8019 - SEWER REHAB 004
1/21/2016 11:51:00 AM
FH - MC - Intersection of Chesapeake St NW and 48th St NW 006_hydrant
1/21/2016 11:51:00 AM
CM with BA logo
12/3/2013 11:26:00 AM
1600-1800 Blocks L St NE 006
1/21/2016 11:51:00 AM
16 restoring public space
7/6/2004 3:44:00 PM
9-10-09 004_fire hydrant
1/21/2016 11:51:00 AM
01 overrall photo of street during construction
6/16/2004 10:26:00 AM

District of Columbia Water and Sewer Authority 

Construction Management 4C | Construction Managment 4D | Construction Management 4E

Since 2004, Bryant has overseen complex, multi-million dollar task-orders for the District of Columbia Water and Sewer Authority (DC Water), on their Construction Management contracts to overhaul their CSO facilities as well as water and wastewater pipes through new technologies.

Being a CM leader for DC Water, Bryant has engaged in over 40 task orders and has delivered on-time and within schedule on all of them regardless of their complexity and tight scheduling.

Under the newest contract CM4E, which will implement critical improvements to DC Water’s distribution and sewer collection systems, Bryant will be overseeing various projects from reservoir ventilation improvements at the Brentwood Reservoir to restoration of the Pope Branch Stream.
© , Bryant Associates Inc, BA Engineers Site Map | Privacy | Contact Us