Camp Taylor is a former WWI training camp turned into a residential neighborhood.

The sewer system was constructed in the early 1900’s and does not meet current needs or standards, therefore MSD is replacing the main line sewers along with the property service connection for thousands of homes in the neighborhood. BA Engineers is part of the construction inspection team for areas 2A and 2B, which include over 50,000 LF of pipe and 300 manholes. This $850M federal consent decree project is scheduled to be completed on time.